§ 9-12. Water main regulations  


Latest version.
  • (a) All water mains placed in the geographical boundaries of the City of Lake Station shall have prior written approval from the board of public works and safety before the excavation and placement of any water lines.

    (b) All new residential subdivision water supply mains shall be a minimum of six (6) inches in diameter and all commercial lines shall be a minimum of eight (8) inches in diameter. When present mains are replaced, they shall conform to the new size requirements unless specific written permission is obtained from the board of public works and safety for any other size variance.

(Ord. No. 82-26, 6-3-82)